Project Title : Vibro Compaction for Meranti Road on Jurong Island
 
Technique : Vibro Compaction
 
The Project
 

The project is part of a highway extension linking the existing Banyan Drive to a jetty for petroleum-carrying vessels. The proposed highway is 39m wide' 1.5km long and with a 20m wide service corridor. The site is located on Jurong Island' a 3'200 ha man-made island joined by several smaller islands through land reclamation. Vibro compaction is proposed to improve the current existing reclaimed sandfill which is up to a depth of 32m.

Challenges include vibro compaction near the VLCC (Very Large Crude-oil Carrier) twin pipeline. An instrumentation trial was carried out to measure displacements and vibrations such that effects due to vibro compaction was be ascertained.

A total of 160'000 square meters of ground' to an average depth of 28m' was improved using 5 Vibro Compaction rigs. A twin-probe system was also adopted for this project.

 
Project Infomation
   
Client : JTC Corporation
Consultant: Jurong Consultant Pte Ltd
Main Contractor: Koon Construction&Transport Co. Pte. Ltd
Work : Volume: 160,000 sq.m
Period Of Execution : Jul-Dec 2005
 
 
   